Glazing – sealing

Glazing – sealing in the Zürich area – precise execution, on‑schedule handover.

Eurofugen – Glazing – sealing in the Zürich area. We prepare the joint plan, verify substrate strength and movement, and select an approved system (neutral‑cure silicone, hybrid/MS polymer, PU) in strict accordance with manufacturer specs. Focus: PVC – Denkmalschutz. Planning priority: Diffusionskonzept & Randzonen. Standards: EN 15651 / ISO 11600; principle “tighter inside than outside”.

Quality & acceptance

  • UV/weather‑resistant sealants fit to exposure
  • Ensure bond at two flanks; prevent three‑sided adhesion using PE backer rod
  • Crisp edges without staining
  • Documented execution incl. photo record
  • Joint width/depth per plan (≈ 2:1)

Planning & preparation

We verify weather and dew point; application only on dry, load‑bearing flanks. Joint layout based on panel sizes and anticipated movement; critical edge zones are eased. Primers are chosen per substrate absorption (e.g., clinker, fair‑faced concrete, fibre cement). Create square, sound flanks, define depth and install the closed‑cell backer rod precisely. Mock‑ups with cut‑and‑pull checks provide pre‑approval. Detailing at edges, reveals and penetrations is recorded in drawings.

Application & control

Use UV‑stable systems and protect adjacent surfaces from contamination. Random cut‑and‑pull checks, width/depth measurements and visual inspection are recorded. Maintain movement capability; remove masking in due time and verify edge adhesion. Apply sealant without bubbles, fill the joint evenly and tool to a slightly concave profile. Transitions at profile joints and material changes are re‑worked separately.

On natural stone we use low‑migration, stone‑safe systems.

Joint routing aligns with the building’s movement grid.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Care guidance and maintenance intervals are included at handover.

Material batches and working times are recorded for traceability.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Joint routing aligns with the building’s movement grid.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Care guidance and maintenance intervals are included at handover.

Material batches and working times are recorded for traceability.

Joint routing aligns with the building’s movement grid.

Joint routing aligns with the building’s movement grid.

Planning & preparation

Clean substrates, define edges and limit bond areas; primers & backer rod are matched to substrate and width. Mock‑ups and dew‑point checks secure approval. Interfaces are coordinated before start.

Application & control

Apply sealant bubble‑free, tool evenly and control dimensions. Check edge adhesion, remove masking in time and re‑work transitions neatly. Everything is recorded.