Roof edge – joints

Roof edge – joints in Central Switzerland – precise execution, on‑schedule handover.

Eurofugen – Roof edge – joints in the Zürich area. We prepare the joint plan, verify substrate strength and movement, and select an approved system (neutral‑cure silicone, hybrid/MS polymer, PU) in strict accordance with manufacturer specs. Focus: Lichtkuppel – Durchdringungen. Planning priority: Bewegungsraster & Anschlussdetails. Standards: EN 15651 / ISO 11600; separate bitumen/PVC/TPO systems.

Quality & acceptance

  • Joint width/depth per plan (≈ 2:1)
  • Crisp edges without staining
  • UV/weather‑resistant sealants fit to exposure
  • Documented execution incl. photo record
  • Uniform, slightly concave finish profile

Planning & preparation

We verify weather and dew point; application only on dry, load‑bearing flanks. Mock‑ups with cut‑and‑pull checks provide pre‑approval. Joint layout based on panel sizes and anticipated movement; critical edge zones are eased. Detailing at edges, reveals and penetrations is recorded in drawings. Create square, sound flanks, define depth and install the closed‑cell backer rod precisely. Primers are chosen per substrate absorption (e.g., clinker, fair‑faced concrete, fibre cement).

Application & control

Transitions at profile joints and material changes are re‑worked separately. Maintain movement capability; remove masking in due time and verify edge adhesion. Use UV‑stable systems and protect adjacent surfaces from contamination. Apply sealant without bubbles, fill the joint evenly and tool to a slightly concave profile. Random cut‑and‑pull checks, width/depth measurements and visual inspection are recorded.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Joint routing aligns with the building’s movement grid.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Material batches and working times are recorded for traceability.

Material batches and working times are recorded for traceability.

Joint routing aligns with the building’s movement grid.

Material batches and working times are recorded for traceability.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Joint routing aligns with the building’s movement grid.

Material batches and working times are recorded for traceability.

On natural stone we use low‑migration, stone‑safe systems.

Joint routing aligns with the building’s movement grid.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Care guidance and maintenance intervals are included at handover.

Interfaces to adjacent trades are clarified to avoid follow‑on damage.

Material batches and working times are recorded for traceability.

Material batches and working times are recorded for traceability.

Planning & preparation

Clean substrates, define edges and limit bond areas; primers & backer rod are matched to substrate and width. Mock‑ups and dew‑point checks secure approval. Interfaces are coordinated before start.

Application & control

Apply sealant bubble‑free, tool evenly and control dimensions. Check edge adhesion, remove masking in time and re‑work transitions neatly. Everything is recorded.