Existing condition
Removal and substrate come before the new joint or surface.
Existing material, adhesion, moisture, geometry and adjoining components determine whether local repair is sensible or a wider build-up must be reviewed.
Purpose and applications
Elastic connection and sanitary joints close defined transitions, accommodate limited movement and support maintainable details. Geometry, bonding surfaces, exposure and a compatible system build-up are decisive.
Existing condition
Existing material, adhesion, moisture, geometry and adjoining components determine whether local repair is sensible or a wider build-up must be reviewed.
Materials

Work process
Separate overview, details, dimensions and observable damage.
Clarify existing layers, disposal and protection of adjoining components.
Check strength, moisture, cleanliness, geometry and compatibility.
Apply the agreed materials and details within the defined conditions.
Document finish, limitations, care and any maintenance joints.
Warning signs
Project preparation
Limitations
Persistent moisture, movement, insufficient build-up or unsuitable adjoining materials may require a broader technical clarification before the selected work can be warranted.
Care and maintenance
Cleaning agents, ventilation, exposure and maintenance intervals depend on the installed system and use. The handover should record applicable care notes and which joints remain maintenance joints.
FAQ
Overview and detail photos, dimensions with units, substrate and existing material, observable damage, access and the desired timeframe.
No. Removal, disposal, substrate repair, protection and finishing must be described as separate scope items and confirmed in the quotation.
Photos support preparation, but compatibility, moisture and concealed build-up may still require testing or an on-site inspection.
Scope and cost factors
Only verified joint-sealing guide values are shown on the estimate page. Coating area prices are not invented.
Total length and joint cross-section
Removal of existing sealant
Cleaning, bonding surfaces and primer requirement
Access, protection and staging
Measurement tool
A result remains a planning value until it is explicitly transferred to the shared project draft.
Open matching toolProject checklist
Checked steps are saved to the same draft; they are not a technical approval.
Open checklistProfessional review
The assistant, appointment calendar and enquiry use the same project context.
INSPIRATION
Ideas for surfaces, materials and thoughtful junctions.
AI-generated illustrations for inspiration, not photographs of completed customer projects.
Shortcut: Ctrl/⌘ + K